Am I reading this right? a 25 mile detour to get to San Carlos lake coming from Globe??? the map which will not post shows it starting right at the Apache Gold Casino?

Construction and 25-mile detour planned at US 70 and BIA 6
03/30/2017

Having trouble viewing this email? https://content.govdelivery.com/accounts/AZDOT/bulletins/19112cd

Bookmark and Share
Improvement project requires full closure of BIA 6 at US 70

Plan for 25-mile detour while work is underway

The first phase of a project to improve safety and traffic flow on the San Carlos Apache Reservation will require a full closure of BIA 6 at US 70 beginning Wednesday, April 5, and continuing approximately four weeks. A 25-mile detour will be in place while the intersection is closed 24 hours a day, seven days a week, through early May.

Drivers should use US 70 east to BIA 170, and then north approximately four miles to reconnect with westbound BIA 6 (see detour map below).

The Arizona Department of Transportation, in cooperation with the San Carlos Apache Tribe and Federal Highway Administration, is constructing a right‐turn lane for westbound US 70 to northbound BIA 6 and an acceleration lane for traffic entering westbound US 70 from southbound BIA 6; installing a drainage culvert; milling and replacing pavement on US 70 and BIA 6; replacing the existing cattle guard across BIA 6; removing and replacing the existing guardrail and fencing; and other improvement work.

Phase one work includes installation of a drainage culvert and replacement of the cattle guard, and is scheduled for completion on May 4.  As always, schedules are subject to change based on weather and other unforeseen factors.

For more information, visit the project web site at azdot.gov/BIA6andUS70. If you have questions or comments, call the ADOT Project Information Line at 855.712.8530 or email Projects@azdot.gov.

ADOT works to inform the public about planned highway restrictions and closures, but it’s possible that unscheduled impacts might occur because of weather or other factors. For the most current information about highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

US 70 and BIA 6 detour route      
Drivers will use US 70 east to BIA 170, and then travel north on BIA 170 for approximately four miles to reconnect with westbound BIA 6 while th
Title: Re: 25 mile detour to get to San Carlos??? hope I am wrong
Post by: ffp1711 on March 31, 2017, 05:00 PM
Bruce, Im pretty sure that doesn't affect the traffic on Hwy 70.  Just the traffic headed to town of San Carlos.   
Title: Re: 25 mile detour to get to San Carlos??? hope I am wrong
Post by: sparkchaser on March 31, 2017, 07:26 PM
There are signs indicating they are working on BIA 6. Seen them every time I have gone that way. It will not impede your travel plans. Party on Garth
Title: Re: 25 mile detour to get to San Carlos??? hope I am wrong
Post by: FishMan on March 31, 2017, 08:32 PM
Party on Wade.
Title: Re: 25 mile detour to get to San Carlos??? hope I am wrong
Post by: on the rocks on April 03, 2017, 09:09 AM
Bruce, no detour as of yesterday. Like others mentioned BIA 6 closed into the town of San Carlos